1000CBM Water Tank Industrial Firefighting Water Tank
$56666-59999 /Set/Sets
| Payment Type: | L/C,T/T,D/P |
| Incoterm: | FOB,CFR,CIF,EXW |
| Min. Order: | 1 Set/Sets |
| Transportation: | Ocean |
| Port: | S,H,A |
$56666-59999 /Set/Sets
| Payment Type: | L/C,T/T,D/P |
| Incoterm: | FOB,CFR,CIF,EXW |
| Min. Order: | 1 Set/Sets |
| Transportation: | Ocean |
| Port: | S,H,A |
Model No.: LPT1000
Brand: LIPP
Certification: ISO9001
| Selling Units | : | Set/Sets |
The file is encrypted. Please fill in the following information to continue accessing it
Maintenance of Industrial Fire Fighting Water Tank
Proper maintenance ensures operational reliability and compliance with safety standards. Key procedures include:
1 Regular Inspection
Check structural integrity, water levels, and connections (pipes, valves, nozzles) for leaks or corrosion.
Inspect auxiliary components (e.g., pumps, alarms) to ensure functionality.
2 Cleaning and Disinfection
Remove sediment, debris, or microbial growth periodically to prevent contamination.
Use non-corrosive cleaning agents to preserve tank material.
3 Functional Testing
Test automatic refill systems, pressure gauges, and backup power supplies.
Verify alarm systems and emergency shut-off valves.
4 Documentation and Reporting
Maintain logs of inspections, repairs, and cleaning schedules.
Address identified issues promptly to avoid compliance violations.
5 Emergency Preparedness
Ensure backup water supply and accessibility during emergencies.
Conduct drills to validate response protocols.

| 1985 | We built the first Lipp silo for Xixia Distillery in Shandong Province, China, filled the gap of Chinese steel silo construction. |
| 1991 | We built the highest steel silo with the height 33m in Lianyungang, it became a milestone in Chinese storage field. |
| 1993 | we built the first silo design institute of China; |
| 1996 | We became the first Chinese company won the international invitation of tender in steel silo field (German Steinecker GMBH, New Zealand Lionna Than Company ) |
| 1998 | We built the biggest steel silo for Uni-President group of Taiwan. |
| 2001 | We built the biggest Steel Tank (dia. 38m) for Chengyang Waste Water Treatment factory, Tsingdao. |
| 2006 | Annual turnover exceeded RMB120 million; turnover exceeds 100 million for 3 consecutive years. |
| 2011 | Given the title “National High & New Technology Enterprise” Annual turnover exceeded RMB250 million |
| 2012 | The chicken farm CSTR anaerobic reaction system (total capacity 7000m3) in Beijing was finished, marking a big step forward for China in the biogas exploitation field. |
| 2013 | Anyang Lipp built the 10000th steel silo, erected silos over 14 countries; |
| 2014 | Became the first to get ISO9000, ISO14001 and ISO45001 certificates among the peers |
| 2018 | Introduce SM80 equipment from Germany, starting making spiral welding silo |
| 2019 | Company move to the modernized brand-new facility |
| 2021 | Secured Anyang Eco-Industrial Park EPC+O project with contract price CNY470 million |





