Applicable Fields:
Cement, fly ash, slag, mine powder, plaster, coal, chemicals, etc.
φ10×H14.656×6
Specification:
★ Ultra wide diameter range (3.5-38m)
★ Multiple height options (5-23m)
★ Three level thickness options (2.0-4.0mm)
★ Ultra large capacity design (up to 7000T)
★ High quality galvanized material (from 275g/m ² up to 600g/m ² as requested)
Dimension Sheet:
LIPP® DOUBLE-SEAM / SPIRAL RIBConventional systems are often unsuitable for the optimum, safe storage of solid or liquid substances and their use can result in premature corrosion, leaks and problems with safety. Flexibility is another important factor. Tanks must be flexible in terms of size and substrate and optimally adaptable to the local conditions.
Verinox ® Innovative composite steel plate solution——Redefine the cost-effectiveness of anti-corrosion storage tanks using bimetallic composite technology
Technological breakthrough
Adopting a revolutionary "steel stainless steel" composite structure:
✓ Inner layer: Customized stainless steel grade according to the characteristics of the medium (304/316L/2205 duplex steel, etc.)
✓ Outer layer: high-strength galvanized structural steel plate
About Us Anyang Lipu Silo Engineering – A Sino-German joint venture backed by SAWA (Lipp technology inventor) and Lipp GmbH. We combine German engineering with Chinese manufacturing excellence, holding Class-II qualifications in steel structure construction and environmental engineering contracting.
Why Partner With Us?
✓ Field-Proven Technical Solutions: Proprietary Lipp patented silo technology
✓ Versatile Industrial Experience: Extensive service experience across cement, grain, construction aggregates and environmental engineering sectors
✓ Global Service Network: Reliably supporting overseas clients ever since the 1990s
✓ Rigorous Quality Accreditation: Fully meets strict global engineering design standards
Milestones
- Established in 1984
- 1st Silo Design Institute in China 1993
- Annual Turnover 100 Million Yuan in 2003
- The 1,000,000th Silo Done in 2013
- ISO9001, ISO14001 & ISO45001 Certified in 2014
- The 1st SM80 Spiral Welding Silo Done in 2020
- CNY427 Million Vein Industrial Part Collaborative Anaerobic Treatment Project Done in 2022
Company Tour