Applicable Fields:
Cement, fly ash, slag, mine powder, plaster, coal, chemicals, etc.
Specification:
Diameter: 3.5 - 38 m
Height: 5 - 23 m
Thickness: 2.0 - 4.0 mm
Capacity: 100 - 7000 ton per silo
Material: galvanized steel
(Galvanized rate ≥ 275g/m2)
Advantages of Lipu Steel Plate Warehouse:
1.Efficient Material Handling
Integrated systems like screw conveyors (commonly used in cement silos) enable automated and precise material transfer, reducing manual labor and improving operational efficiency in batching plants.
2.Customizable and Scalable Design
Lipp silos can be tailored to specific capacity requirements, from small-scale units to large-scale installations. Modular construction allows for easy expansion or relocation as storage needs evolve.
3.Cost-Effective Maintenance
With corrosion-resistant galvanization and simplified structural components, Lipp silos require minimal upkeep. Long-term warranties (e.g., 1-year coverage) further ensure reduced lifecycle costs.
LIPP® DOUBLE-SEAM / SPIRAL RIB

About Us

Core technical parameters demonstrate leadership position:
- Patent reserve: 37 core patents for spiral coil storage (including 5 PCT international patents)
- Manufacturing accuracy: ± 1.5mm diameter tolerance (exceeding DIN 18807 standard)
- Engineering capability: The maximum capacity of a single project exceeds 50000 tons
- Certification System: Full coverage of ISO9001/ISO14001/OHSAS18001 three systems
The technical supervision team of Lip GmbH in Germany is stationed to provide guidance and ensure that the process is iterated synchronously with the Hanover headquarters.
Milestones
Founding Foundation (1985-1996):
▷The first steel silo project in China was completed in 1985
▷Established the industry's first design and research institute in 1993
▷Successfully expanded into the international market in 1996
Rapid development (1998-2013):
✓ The largest capacity warehouse of Taiwanese funded enterprises in 1998
✓ The largest diameter sewage tank in Asia in 2001
✓ In 2006, the revenue exceeded 100 million yuan
✓ Obtained National High tech Enterprise Certification in 2011
✓ In 2013, the scale of 10000 warehouses was achieved
Innovation Navigator (2014-2021):
•Completed the three system certification in 2014
•Introduction of cutting-edge equipment from Germany in 2018
•Entered the modern industrial park in 2019
•Achieved nearly 500 million EPC+O projects in 2021